Llamanos gratis



Patas/Juego de Patas
(All Points 26-2073 Leg)



All Points 26-2073 Leg
All Points 26-2073 Leg (Magnified)
All Points 26-2073 Leg
Precio:
Precio de Lista: $8.06
$7.43
Envio:
×
Agrega al Carrito
You have 0 in your cart


Send to my wish list

Se el primero en dar una opinión




Información del Producto

equipo/electrodoméstico pata, ajustable(s) 10.16cm - 14.605cmH, .9525cm-16 clavo/tachuela montaje, brida , fundido a presión metal con satinado(a) acabado de níquel, reemplaza a Groen: 041121, Estrella Fabricante: 2A-Z0314, Y7113, Z0314 (CCC artículo 2720-02) (artículo ICS A2303) (precio neto)

Especificaciones

Fabricante All Points
Modelo # ALL-26-2073
Empacado Each
HEIGHT 5-3/4"

Dimensiones del Producto

  • Peso: 0.66 lbs
Share this result using
     

Opiniones

Se el primero en opinar!

Entre o regístrese para opinar

Productos Vistos Recientemente

Bar Maid Commercial Blender, 64 oz. capacity, high/low speeds, on/off switch, BPA free Tritan plastic, 3 HP motor, 120v/60/1-ph, ETL-Sanitation, cETLus

  • Agrégalo al carrito
  • $296.50
  • Para ver el Precio

Camshelving Basics Plus Add-On Unit, 18"W x 42"L x 72"H, 4-tier, withstands temperature from -36F (-38C) to 190F (88C), includes: (3) vented and (1) solid polypropylene shelf plates, (2) composite posts with leveling feet installed, pre-assembled post connectors & wedges, (8) traverses & (4) bags of 8 dovetails (4 each A & B), 600 lbs. capacity per shelf (400 lbs. top shelf) /2,200 lbs. max capacity, brushed graphite, NSF

Range, gas, 48" wide, (4) 24,000 BTU star burners with 12" square cast iron grates, (1) 24" - 3/4" thick griddle with manual controls, (1) space-saver oven with enamel door & bottom linings & (1) 22" wide storage space, (1) oven rack with 3 positions, stainless steel exterior finish, back riser & high shelf, 6" stainless steel legs, 37" tall to cook surface, 146,000 BTU, NSF, cETLus

Bugambilia Salad Bar Bowl, 1.77 qt., 14-5/8"L x 3-7/8"W x 3"H, rectangular, straight sided, cast aluminum with resin coating, classic finish, NSF (3-4 week lead time)