Llamanos gratis



Salad Crock, Metal
(GET Enterprises COMP09-MOD Salad Crock, Metal)



GET Enterprises COMP09-MOD Salad Crock, Metal
GET Enterprises COMP09-MOD Salad Crock, Metal (Magnified)
GET Enterprises COMP09-MOD Salad Crock, Metal
Precio:
Precio de Lista: $154.42
$77.21
Envio:
×
Agrega al Carrito
You have 0 in your cart


Send to my wish list

Se el primero en dar una opinión




Información del Producto

Bugambilia® Bol para barra de Ensaladas, 2.1 cuartos de galón., 50.3238cmde largo x 17.6213cmde ancho x 3.9688cmH, rectangular, de costados rectos, aluminio fundido con resina revestimiento, liso(a) MOD acabado, NSF (3-4 semanas de plazo de espera)

Especificaciones

Fabricante GET Enterprises
Modelo # GET-COMP09-MOD
Empacado Case

Dimensiones del Producto

  • Altura: 1.54"
  • Ancho: 19.84"
  • Profundidad: 6.97"
Share this result using
     

Opiniones

Se el primero en opinar!

Entre o regístrese para opinar

Productos Similares

GET Enterprises COMP04-MOD Salad Crock, Metal
Salad Crock, Metal
(GET Enterprises COMP04-MOD Salad Crock, Metal)

Bugambilia Salad Bar Bowl, straight-sided, 169.08 oz., 6.89"L x 20"W, 3" deep, rectangle, cast aluminum with resin coating, smooth finish, NSF (3-4 week lead time)

GET Enterprises COMP18-MOD Salad Crock, Metal
Salad Crock, Metal
(GET Enterprises COMP18-MOD Salad Crock, Metal)

Bugambilia Salad Bar Bowl, 253.613 oz., 10"L x 10"W, 6" deep, square, straight-sided, cast aluminum with resin coating, smooth finish, NSF (3-4 week lead time)

GET Enterprises COMP08-MOD Salad Crock, Metal
Salad Crock, Metal
(GET Enterprises COMP08-MOD Salad Crock, Metal)

Bugambilia Salad Bar Bowl, straight-sided, 40.58 oz., 10"L x 10"W, 1.5" deep, square, cast aluminum with resin coating, smooth finish, NSF (3-4 week lead time)

GET Enterprises COMP22-MOD Salad Crock, Metal
Salad Crock, Metal
(GET Enterprises COMP22-MOD Salad Crock, Metal)

Bugambilia Salad Bar Bowl, 4.9 quarts, 9-3/4"L x 9-3/4"W, 3" deep, square, straight-sided, cast aluminum with resin coating, smooth finish, NSF (3-4 week lead time)