Llamanos gratis



Salad Crock, Metal
(GET Enterprises COMP18 Salad Crock, Metal)



GET Enterprises COMP18 Salad Crock, Metal
GET Enterprises COMP18 Salad Crock, Metal (Magnified)
GET Enterprises COMP18 Salad Crock, Metal
Precio:
Precio de Lista: $297.00
$148.50
Envio:
×
Agrega al Carrito
You have 0 in your cart


Send to my wish list

Se el primero en dar una opinión




Información del Producto

Bugambilia® Bol para barra de Ensaladas, 7.9 cuartos de galón., 25.4cmde largo x 25.4cmde ancho x 15.24cmH, cuadrado, de costados rectos, aluminio fundido con resina revestimiento, Classic acabado, NSF (3-4 semanas de plazo de espera)

Especificaciones

Fabricante GET Enterprises
Modelo # GET-COMP18
Empacado Case

Dimensiones del Producto

  • Altura: 6.00"
  • Ancho: 10.00"
  • Profundidad: 10.00"
  • Peso: 4.74 lbs
Share this result using
     

Opiniones

Se el primero en opinar!

Entre o regístrese para opinar

Productos Similares

GET Enterprises COMP30-MOD Salad Crock, Metal
Salad Crock, Metal
(GET Enterprises COMP30-MOD Salad Crock, Metal)

Bugambilia Salad Bar Bowl, 30.05 oz., 4-1/4"L x 4-1/4"W x 5"H, square, inclined, straight sided, cast aluminum with resin coating, smooth MOD finish, NSF (3-4 week lead time)

GET Enterprises COMP37 Salad Crock, Metal
Salad Crock, Metal
(GET Enterprises COMP37 Salad Crock, Metal)

Bugambilia Salad Bar Bowl, 1.99 qt., 19-5/8"L x 3-1/4"W x 3"H, rectangular, straight sided, cast aluminum with resin coating, classic finish, NSF (3-4 week lead time)

GET Enterprises COMP25-MOD Salad Crock, Metal
Salad Crock, Metal
(GET Enterprises COMP25-MOD Salad Crock, Metal)

Bugambilia Salad Bar Bowl, 1.77 qt., 14-5/8"L x 3-7/8"W x 3"H, rectangular, straight sided, cast aluminum with resin coating, smooth MOD finish, NSF (3-4 week lead time)

GET Enterprises COMP32-MOD Salad Crock, Metal
Salad Crock, Metal
(GET Enterprises COMP32-MOD Salad Crock, Metal)

Bugambilia Salad Bar Bowl, 4.19 qt., 9-1/2"L x 8-1/2"W x 5"H, rectangular, inclined, straight sided, cast aluminum with resin coating, smooth MOD finish, NSF (3-4 week lead time)