Llamanos gratis



Salad Crock, Metal
(GET Enterprises COMP27-MOD Salad Crock, Metal)



GET Enterprises COMP27-MOD Salad Crock, Metal
GET Enterprises COMP27-MOD Salad Crock, Metal (Magnified)
GET Enterprises COMP27-MOD Salad Crock, Metal
Precio:
Precio de Lista: $286.86
$143.43
Envio:
×
Agrega al Carrito
You have 0 in your cart


Send to my wish list

Se el primero en dar una opinión




Información del Producto

Bugambilia® Bol para barra de Ensaladas, 4.8 cuartos de galón., 53.975cmde largo x 18.415cmde ancho x 7.62cmH, rectangular, lados rectos, aluminio fundido con resina revestimiento, liso(a) MOD acabado, NSF (3-4 semanas de plazo de espera)

Especificaciones

Fabricante GET Enterprises
Modelo # GET-COMP27-MOD
Empacado Case

Dimensiones del Producto

  • Altura: 3.00"
  • Ancho: 21.25"
  • Profundidad: 7.25"
  • Peso: 3.50 lbs
Share this result using
     

Opiniones

Se el primero en opinar!

Entre o regístrese para opinar

Productos Similares

GET Enterprises COMP27 Salad Crock, Metal
Salad Crock, Metal
(GET Enterprises COMP27 Salad Crock, Metal)

Bugambilia Salad Bar Bowl, 4.8 qt., 21-1/4"L x 7-1/4"W x 3"H, rectangular, straight sided, cast aluminum with resin coating, classic finish, NSF (3-4 week lead time)

GET Enterprises COMP38-MOD Salad Crock, Metal
Salad Crock, Metal
(GET Enterprises COMP38-MOD Salad Crock, Metal)

Bugambilia Salad Bar Bowl, 3.96 qt., 19-11/16"L x 6-1/2"W x 3"H, rectangular, straight sided, cast aluminum with resin coating, smooth MOD finish, NSF (3-4 week lead time)

GET Enterprises COMP46 Salad Crock, Metal
Salad Crock, Metal
(GET Enterprises COMP46 Salad Crock, Metal)

Bugambilia Salad Bar Bowl, 1.10 qt., 6-3/16"L x 5-3/4"W x 3"H, rectangular, straight sided, cast aluminum with resin coating, classic finish, NSF (3-4 week lead time)

GET Enterprises COMP41-MOD Salad Crock, Metal
Salad Crock, Metal
(GET Enterprises COMP41-MOD Salad Crock, Metal)

Bugambilia Salad Bar Bowl, 5.88 qt., 18"L x 7"W x 4-1/2"H, rectangular, straight sided, cast aluminum with resin coating, smooth MOD finish, NSF (3-4 week lead time)