Llamanos gratis



Salad Crock, Metal
(GET Enterprises COMP52-MOD Salad Crock, Metal)



GET Enterprises COMP52-MOD Salad Crock, Metal
GET Enterprises COMP52-MOD Salad Crock, Metal (Magnified)
GET Enterprises COMP52-MOD Salad Crock, Metal
Precio:
Precio de Lista: $401.12
$200.56
Envio:
×
Agrega al Carrito
You have 0 in your cart


Send to my wish list

Se el primero en dar una opinión




Información del Producto

Bugambilia® Bol para barra de Ensaladas, 5.73 cuartos de galón., 58.42cmde largo x 15.24cmde ancho x 10.16cmH, rectangular, lados rectos, aluminio fundido con resina revestimiento, liso(a) MOD acabado, NSF (3-4 semanas de plazo de espera)

Especificaciones

Fabricante GET Enterprises
Modelo # GET-COMP52-MOD
Empacado Case

Dimensiones del Producto

  • Altura: 4.00"
  • Ancho: 23.00"
  • Profundidad: 6.00"
  • Peso: 6.70 lbs
Share this result using
     

Opiniones

Se el primero en opinar!

Entre o regístrese para opinar

Productos Similares

GET Enterprises COMP57-MOD Salad Crock, Metal
Salad Crock, Metal
(GET Enterprises COMP57-MOD Salad Crock, Metal)

Bugambilia Salad Bar Bowl, 3.05 qt., 8-1/2"L x 5-3/4"W x 6"H, rectangular, straight sided, cast aluminum with resin coating, smooth MOD finish, NSF (3-4 week lead time)

GET Enterprises COMP53-MOD Salad Crock, Metal
Salad Crock, Metal
(GET Enterprises COMP53-MOD Salad Crock, Metal)

Bugambilia Salad Bar Bowl, 2.60 qt., 6-13/16"L x 6-1/8"W x 6"H, rectangular, straight sided, cast aluminum with resin coating, smooth MOD finish, NSF (3-4 week lead time)

GET Enterprises COMP18 Salad Crock, Metal
Salad Crock, Metal
(GET Enterprises COMP18 Salad Crock, Metal)

Bugambilia Salad Bar Bowl, 7.9 qt., 10"L x 10"W x 6"H, square, straight-sided, cast aluminum with resin coating, classic finish, NSF (3-4 week lead time)

GET Enterprises COMP22 Salad Crock, Metal
Salad Crock, Metal
(GET Enterprises COMP22 Salad Crock, Metal)

Bugambilia Salad Bar Bowl, 4.9 qt., 9-3/4"L x 9-3/4"W x 3"H, square, straight-sided, cast aluminum with resin coating, classic finish, NSF (3-4 week lead time)