Llamanos gratis



Salad Crock, Metal
(GET Enterprises COMP59-MOD Salad Crock, Metal)



GET Enterprises COMP59-MOD Salad Crock, Metal
GET Enterprises COMP59-MOD Salad Crock, Metal (Magnified)
GET Enterprises COMP59-MOD Salad Crock, Metal
Precio:
Precio de Lista: $430.62
$215.31
Envio:
×
Agrega al Carrito
You have 0 in your cart


Send to my wish list

Se el primero en dar una opinión




Información del Producto

Bugambilia® Bol para barra de Ensaladas, 7.90 cuartos de galón., 49.53cmde largo x 24.765cmde ancho x 10.16cmH, rectangular, lados rectos, aluminio fundido con resina revestimiento, liso(a) MOD acabado, NSF (3-4 semanas de plazo de espera)

Especificaciones

Fabricante GET Enterprises
Modelo # GET-COMP59-MOD
Empacado Case

Dimensiones del Producto

  • Altura: 4.00"
  • Ancho: 19.50"
  • Profundidad: 9.75"
  • Peso: 4.70 lbs
Share this result using
     

Opiniones

Se el primero en opinar!

Entre o regístrese para opinar

Productos Similares

GET Enterprises COMP49-MOD Salad Crock, Metal
Salad Crock, Metal
(GET Enterprises COMP49-MOD Salad Crock, Metal)

Bugambilia Salad Bar Bowl, 1.74 qt., 8"L x 7"W x 3"H, rectangular, straight sided, cast aluminum with resin coating, smooth MOD finish, NSF (3-4 week lead time)

GET Enterprises COMP37-MOD Salad Crock, Metal
Salad Crock, Metal
(GET Enterprises COMP37-MOD Salad Crock, Metal)

Bugambilia Salad Bar Bowl, 1.99 qt., 19-5/8"L x 3-1/4"W x 3"H, rectangular, straight sided, cast aluminum with resin coating, smooth MOD finish, NSF (3-4 week lead time)

GET Enterprises COMP45 Salad Crock, Metal
Salad Crock, Metal
(GET Enterprises COMP45 Salad Crock, Metal)

Bugambilia Salad Bar Bowl, 1.65 qt., 9-1/4"L x 5-3/4"W x 3"H, rectangular, straight sided, cast aluminum with resin coating, classic finish, NSF (3-4 week lead time)

GET Enterprises COMP39-MOD Salad Crock, Metal
Salad Crock, Metal
(GET Enterprises COMP39-MOD Salad Crock, Metal)

Bugambilia Salad Bar Bowl, 2.30 qt., 9"L x 7"W x 3-1/2"H, rectangular, straight sided, cast aluminum with resin coating, smooth MOD finish, NSF (3-4 week lead time)