Llamanos gratis



Salad Crock, Metal
(GET Enterprises IS022-MOD Salad Crock, Metal)



GET Enterprises IS022-MOD Salad Crock, Metal
GET Enterprises IS022-MOD Salad Crock, Metal (Magnified)
GET Enterprises IS022-MOD Salad Crock, Metal
Precio:
Precio de Lista: $138.56
$69.28
Envio:
×
Agrega al Carrito
You have 0 in your cart


Send to my wish list

Se el primero en dar una opinión




Información del Producto

Bugambilia® Bol para barra de Ensaladas, 38.04 onzas., 12.4cmde largo x 12.4cmW, 15.7cm de profundidad/profundo, cuadrado, encaja T0A3, T0B3, T0A19 & T0B19 Baldosas, aluminio fundido con resina revestimiento, liso(a) acabado, NSF (3-4 semanas de plazo de espera)

Especificaciones

Fabricante GET Enterprises
Modelo # GET-IS022-MOD
Empacado Case

Dimensiones del Producto

  • Altura: 6.18"
  • Ancho: 4.88"
  • Profundidad: 4.88"
Share this result using
     

Opiniones

Se el primero en opinar!

Entre o regístrese para opinar

Productos Similares

GET Enterprises ISS25-MOD Salad Crock, Metal
Salad Crock, Metal
(GET Enterprises ISS25-MOD Salad Crock, Metal)

Bugambilia Salad Bar Bowl, 101.45 oz., 9-1/4"L x 9-1/4"W, 7.09" deep, square, sloping from 7" to 5", cast aluminum with resin coating, smooth finish, NSF (3-4 week lead time)

GET Enterprises COMP17-MOD Salad Crock, Metal
Salad Crock, Metal
(GET Enterprises COMP17-MOD Salad Crock, Metal)

Bugambilia Salad Bar Bowl, 202.89 oz., 19.25"L x 11.5"W, 2.5" deep, rectangle, straight-sided, cast aluminum with resin coating, smooth finish, NSF (3-4 week lead time)

GET Enterprises IS013-MOD Salad Crock, Metal
Salad Crock, Metal
(GET Enterprises IS013-MOD Salad Crock, Metal)

Bugambilia Salad Bar Bowl, 57-1/2 oz., 6-1/3"L x 6-1/3"W, 5" deep, square, cast aluminum with resin coating, smooth finish, NSF (3-4 week lead time)

GET Enterprises COMP21-MOD Salad Crock, Metal
Salad Crock, Metal
(GET Enterprises COMP21-MOD Salad Crock, Metal)

Bugambilia Salad Bar Bowl, 2.4 quarts, 9-3/4"L x 4-3/4"W, 3" deep, rectangle, straight-sided, cast aluminum with resin coating, smooth finish, NSF (3-4 week lead time)