Llamanos gratis



Bowl, Metal (unknown capacity)
(GET Enterprises TFRD22-MOD Bowl, Metal (unknown capacity))



GET Enterprises TFRD22-MOD Bowl, Metal (unknown capacity)
GET Enterprises TFRD22-MOD Bowl, Metal (unknown capacity) (Magnified)
GET Enterprises TFRD22-MOD Bowl, Metal (unknown capacity)
Precio:
Precio de Lista: $133.21
$66.61
Envio:
×
Agrega al Carrito
You have 0 in your cart


Send to my wish list

Se el primero en dar una opinión




Información del Producto

Bugambilia® Miami bol para bufet, 17.78cm (de) diámetro., 11.43cm de profundidad/profundo, pequeño(a)(s), redondo(s), aluminio fundido con resina revestimiento, liso(a) acabado, NSF (3-4 semanas de plazo de espera)

Especificaciones

Fabricante GET Enterprises
Modelo # GET-TFRD22-MOD
Empacado Case

Dimensiones del Producto

  • Altura: 4.50"
  • Ancho: 7.00"
Share this result using
     

Opiniones

Se el primero en opinar!

Entre o regístrese para opinar

Productos Similares

GET Enterprises SBWRB1-MOD Bowl, Metal (unknown capacity)
Bowl, Metal (unknown capacity)
(GET Enterprises SBWRB1-MOD Bowl, Metal (unknown capacity))

Bugambilia Bowl, 8"L x 10"W, 4" deep, rectangle, cast aluminum with resin coating, smooth finish, NSF (3-4 week lead time)

GET Enterprises TFRD36-MOD Bowl, Metal (unknown capacity)
Bowl, Metal (unknown capacity)
(GET Enterprises TFRD36-MOD Bowl, Metal (unknown capacity))

Bugambilia Miami Buffet Bowl, 13-1/2"L x 13"W, 8-1/2" deep, x-large, round, cast aluminum with resin coating, smooth finish, NSF (3-4 week lead time)

GET Enterprises FRD04-MOD Bowl, Metal (unknown capacity)
Bowl, Metal (unknown capacity)
(GET Enterprises FRD04-MOD Bowl, Metal (unknown capacity))

Bugambilia Bowl, 10" dia., 4" deep, round, large, cast aluminum with resin coating, smooth finish, NSF (3-4 week lead time)

GET Enterprises TFRD24-MOD Bowl, Metal (unknown capacity)
Bowl, Metal (unknown capacity)
(GET Enterprises TFRD24-MOD Bowl, Metal (unknown capacity))

Bugambilia Bowl, 10" dia., 6" deep, large, round, cast aluminum with resin coating, smooth finish, NSF (3-4 week lead time)